SKU: QU101-PN
Brass and solid metal die cast construction
Includes mounting hardware
2 3/4 inch projection from wall
1 3/8 inch bar thickness
Cannot be cut
Do not pre-drill mounting holes. Wait until product is in possession to install. Hole placement needs to be exact to hide the mounting hardware.
Brass and solid metal die cast construction
Includes mounting hardware
2 3/4 inch projection from wall
1 3/8 inch bar thickness
Cannot be cut
Do not pre-drill mounting holes. Wait until product is in possession to install. Hole placement needs to be exact to hide the mounting hardware.
Limited Lifetime Warranty